Arcadia Release Notes – February 20th, 2026

Arcadia Release Notes – February 20th, 2026 Release version: 1-21-3-28Category: Stability Improvements This release focuses on workflow efficiency and data consistency. We’ve streamlined the Component Editor by consolidating redundant warnings and improved the accuracy of our reporting and imports. Key additions include expanded character support for KBL imports, better visibility for wire cut list report, […]
smartBuild Form Factors: Flexible Build Stations for Modern Wire Harness Manufacturing

Discover why BOM errors keep coming back in wire harness design and what your team can do to stop them once and for all.
What Engineers Miss About Data Version Control

ECAD vs MCAD: What’s the difference and how does it impact electrical engineers?
The smartBuild Way: Transforming Wire Harness Manufacturing from a cost center to a competitive advantage
ECAD vs MCAD: What’s the difference and how does it impact electrical engineers?
Why BOM Errors Keep Coming Back in Wire Harness Design

Discover why BOM errors keep coming back in wire harness design and what your team can do to stop them once and for all.
Arcadia Release Notes – February 6th, 2026

Arcadia Release Notes – February 6th, 2026 Release version: 1-21-3-27Category: New Features and Stability Improvements This release brings a set of thoughtful improvements across schematics and harness design, aimed at making everyday work smoother and faster. We have focused on reducing repetitive scrolling and clicks, helping you stay in flow while designing. We have also […]
The smartBuild Way: AI Build Sequence

Discover why BOM errors keep coming back in wire harness design and what your team can do to stop them once and for all.
50% Faster, 95% Fewer Errors: The New Standard for Wire Harness Production

Faster, Full Traceability, and Fewer Defects: The New Standard for Wire Harness Production is here. Introducing smartBuild!
smartBuild Brochure – Uncover the Power of Digital Harness Assembly

ECAD vs MCAD: What’s the difference and how does it impact electrical engineers?
Leading Utility Equipment Manufacturer Builds a More Cohesive Harness Manufacturing Process

Leading Utility Equipment Manufacturer Digitizes the harness build process, eliminating physical formboard production Utility Equipment Manufacturer reduces rework, accelerates design cycles, and ensures product quality with smartBuild and Arcadia Download The Case Study Harnesses were built using physical formboards with costs between $250 and $450 and which required significant storage space. Challenge Solution smartBuild implementation […]