Webinar On-Demand
When a customer drawing lands on your desk, how long until you have an accurate BOM? A few hours? A day? A few days? For most wire harness manufacturers, that one step holds up everything else. Costing, quoting and production all wait on it, and too often the same information gets read, typed and checked by hand five or six times before a job ever reaches the shop floor.
That is time and labor you cannot get back, and it adds up fast across every RFQ and every harness you build in a year.
The BOM is where the real leverage is.
In this session, Cadonix Lead Product Manager Vidhya Arivalagan breaks down where time and labor actually go in a typical process, and how a connected workflow closes the gap between engineering, quoting and manufacturing for good. You will see how Import AI, harness generation, validation and costing work from the same design data, and why getting to an accurate BOM sooner pulls the rest of the process forward with it.
In this webinar, you will learn how to take hours and days out of your process from customer data to production, and why the biggest gains come from removing hand-offs, not working harder.
Watch the webinar to learn:
· Where the five manual hand-offs sit in a typical Time-to-BOM process, and why each one adds time, labor and risk
· How Import AI extracts wire tables directly from a customer PDF, cutting hours of manual data entry down to minutes
· Why generating the BOM directly from the design keeps it in step with every revision, moving Time-to-BOM from days to hours
· How Harness AI catches design issues while they are still cheap to fix, instead of on the shop floor
· How connecting costing to the BOM removes re-entry and turns a one-to-three week quoting process into a matter of days
· Why manufacturing reports, formboards and work instructions can be ready the moment the BOM is ready
· How smartBuild carries engineering data straight to the shop floor with no translation step and no separate training
· What this adds up to for NPI: faster time-to-BOM, faster quoting, and 20 to 50 percent faster build times
· Four practical takeaways you can apply to your very next RFQ
Ready to see how a connected process can cut your Time-to-BOM, speed up quoting and get your harnesses production-ready faster? Fill out the form and have the webinar sent directly to your inbox.
Whether you’re reducing formboard lead times or transitioning to digital build stations, smartBuild by Re:Build Cadonix removes manual complexity from harness assembly so your teams can build faster, with higher quality, and complete confidence from design through testing.